Installation Query

Pre-Requisites for Installing a Front Loader

FRANCIS N

Last Update 4 years ago

Additional Notes:

 Water pressure - In one minute 10-12 Ltrs of water should flow from the tap. (Minimum 0.5 bar pressure is required)


 Electric Connection - The machine works in 15 Amp earthed plug point.


 Angle Cork - The customer should arrange for a ¾” angle cork for plumbing from the plumber.


 Trolley/Stand - We should inform the customer that our machines should NOT BE KEPT ON TROLLEY. Keeping the machine on the trolley causes vibration in the machine.


 Installation Area -  The area where the machine will be installed should be properly ventilated. This will avoid the machine from rusting.


 Covers - The machine also should not be covered by any form of covers. 

Was this article helpful?

26 out of 27 liked this article