Installation Query
Pre-Requisites for Installing a Front Loader
FRANCIS N
Last Update 4 years ago

Additional Notes:
Water pressure - In one minute 10-12 Ltrs of water should flow from the tap. (Minimum 0.5 bar pressure is required)
Electric Connection - The machine works in 15 Amp earthed plug point.
Angle Cork - The customer should arrange for a ¾” angle cork for plumbing from the plumber.
Trolley/Stand - We should inform the customer that our machines should NOT BE KEPT ON TROLLEY. Keeping the machine on the trolley causes vibration in the machine.
Installation Area - The area where the machine will be installed should be properly ventilated. This will avoid the machine from rusting.
Covers - The machine also should not be covered by any form of covers.